![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 99](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916099.webp)
99
Hardware
9 x Rocks
Other Parts
Step 54: Attach Rocks to Climbing Wall
9 x
#8 x 1” Pan Screw
9 x
¼ x 1-1/4” Pan Bolt (LW1, FW0, BN1)
S10
A:
Alternating colours and shapes, attach 1 rock to each rock board using 1 (PB2) ¼ x 1-1/4” Pan Bolt (with ¼”
lock washer, 3/16” flat washer and ¼” barrel nut) and 1 (S10) #8 x 1” Pan Screw per rock. (Fig. 54.1 & 54.2 &
54.3)
The Pan Screw is placed in the hole beneath the Pan Bolt.
Make sure all hardware is used to secure each rock properly.
S10
PB2
rock
PB2
Fig. 54.3
Fig. 54.1
Fig. 54.2
LW1
FW0
BN1