![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 98](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916098.webp)
98
A:
On the left side of the tunnel wall place 1 (6007) Wall Support beside the (6000) Upper Post. The top of the
(6007) Wall Support should be behind the (6030) Tunnel Side Top and the bottom end should be on the outside of
the (6017) Floor Support. Attach using 1 (H2) ¼ x 2” Hex Bolts (with flat washer, lock washer and t-nut) in tunnel
side and 1 (H3) ¼ x 2-1/2” Hex Bolt in Floor Support. (Fig. 53.1 & 53.2)
B:
Repeat step A to install a second (6007) Wall Support on the right side of the tunnel wall. (Fig. 53.1 & 53.2)
C:
Measure to ensure that there is a 17” (432mm) space between the 2 (6007) Wall Supports and attach 1 (6014)
Tunnel Spacer flush to the top of the floor boards with 5 (S11) #8 x 2” Wood Screws.(Fig. 53.1 & 53.2)
Step 53: Attach Tunnel Wall Assembly
flush to
floor boards
6007
6000
6012
6030
6002
6014
H2
H2
H3
H3
x 5
17” (432mm)
S11
Hardware
5 x
#8 x 2” Wood Screws
S11
Wood Parts
2 x
Wall Support 1-1/4 x 3 x 43-1/8”
1 x
Tunnel Spacer 1-1/4 x 3 x 16-15/16”
2 x
¼ x 2-1/2” Hex Bolt (LW1, FW1, TN1)
2 x
¼ x 2” Hex Bolt (LW1, FW1, TN1)
H3
H2
6007
6014
Fig. 53.2
Fig. 53.1
FW1
FW1
FW1
LW1
LW1
LW1
TN1
TN1
TN1