![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916021.webp)
21
2677
Step 2: Frame Assembly
Part 1
It is important to assemble the frame on a flat, smooth surface.
A:
Place (2627) SW Wall Panel between 2 (2677) Narrow Panels noticing the panel orientations. The tops and
bottoms of the panels should be flush. Make sure the panels are square then using the pilot holes as a guide
pre-drill with a 3/16” drill bit and fasten the front (2677) Narrow Panel to (2627) SW Wall Panel and (2627) SW
Wall Panel to the back (2677) Narrow Panel with 4 (WL5) 1/4 x 2-1/2” Wafer Lags per side. (fig. 2.1, 2.2 and 2.3)
2 x
Narrow Panel 1-1/4 x 22 x 87”
1 x
SW Wall Panel 1-1/4 x 42 x 87”
2677
2627
Fig. 2.2
Wood Parts
Fig. 2.1
2627
Flush
Hardware
8 x
1/4 x 2-1/2” Wafer Lag
WL5
Flush
Notice front
(2677) Narrow
Panel overlaps
(2627) SW Wall
Panel
WL5
WL5
Notice (2627) SW Wall
Panel overlaps back
(2677) Narrow Panel
Front
Back
Swing Side
2677
Front
Flush
Top View
WL5
Fig. 2.3
x 4 per
side
Notice grooves
face inwards
Swing Side
2627
Notice counter sunk
holes on the outside
Back
Flush
2677