![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 70](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916070.webp)
70
Step 32: Upper Window Installation
A:
On the Front and Back Walls place 1 (2683) Wall Tie tight to the top of the floor boards and 1/4” in from both
sides of the centre board in each (2618) Front Back Panel then attach with 3 (S11) #8 x 2” Wood Screws. (fig. 32.1
and 32.2)
B:
Tight to the top of each (2618) Front Back Panel over each (2683) Wall Tie place 1 (2802) Transom Window on
each panel and attach with 1 (S11) #8 x 2” Wood Screw from the inside and 2 (S11) #8 x 2” Wood Screws from the
outside per (2802) Transom Window. (fig. 32.1, 32.3 and 32.4)
2 x
Wall Tie 5/4 x 3 x 62-5/8”
2 x
Transom Window 1-1/4 x 19 x 43””
12 x
#8 x 2” Wood Screw
Hardware
Wood Parts
S11
2683
2802
Fig. 32.2
Tight
Fig. 32.3
Front
Back
Fig. 32.1
2618
2618
2683
2802
2802
Inside View
Outside View
1/4”
S11
2618
Tight and centred
S11
2618
2802
2683
2683
Fig. 32.4
Inside View
S11
2802
2683
Inserts Not
Shown