![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 105](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916105.webp)
105
4 x 3201532
Other Parts
Step 59: Install Swing Brackets
A:
From outside the tunnel assembly, measure 1-1/4” in from each end of the (6035) Tunnel Side Joists and
attach 4 Swing Brackets using 1 (G1) 5/16 x 1-1/2” Hex Bolt (with flat washer and lock washer) per bracket.
(fig. 59.1 and 59.2)
Hardware
A
5/16 x 1-1/2" Hex Bolt X4 (washer & loc washer)
leave 1-1/4" to end of board
1-1/4”
6035
Swing
Brackets
4 x
5/16 x 1-1/2” Hex Bolt (LW2, FW2)
G1
G1
Fig. 59.1
Fig. 59.2
FW2
LW2