![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 109](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916109.webp)
109
C
Wood Parts
Hardware
Step 62: Install Upper Tunnel Insert
A:
From inside the Adventure Tower measure 1-5/8” down from the top of the Wall Support as shown in fig. 46.2
and place the (6038) Upper Tunnel Insert into the opening. Attach to the Wall Supports using 4 (S0) #8 x 7/8”
Truss Screws. (fig. 62.1 and 62.2)
Fig. 62.1
Fig. 62.2
x 2 per side
S0
6038
6038
4 x
#8 x 7/8” Truss Screw
S0
1 x
Upper Tunnel Insert 1-1/4 x 14-1/4 x 18-3/4”
6038
1-5/8”