![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 69](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916069.webp)
69
Fig. 31.5
C:
On the Back of the fort place 1 (2684) Mid Roof End flush to the top of each (2677) Narrow Panel centred over
the pilot holes then measure 1-1/4” down from the top of the panel and attach from the inside with 1 (S4) #8 x 3”
Wood Screw and from the outside with 1 (S3) #8 x 2-1/2” Wood Screw per Mid Roof End. (fig. 31.4 and 31.5)
D:
On the Front of the fort place 1 (2684) Mid Roof End flush to the top of each (2677) Narrow Panel centred over
the pilot holes then measure 1-1/4” down from the top of the panel and attach from the inside with 1 (S4) #8 x 3”
Wood Screw and from the outside with 1 (S3) #8 x 2-1/2” Wood Screw per Mid Roof End. (fig. 31.4 and 31.6)
Step 31: Attach Roof Ends
Part 2
Flush
Flush
Back
Fig. 31.6
2684
Flush
Flush
Front
Hardware
4 x
Mid Roof End 1-1/4 x 4-7/8 x 7”
Wood Parts
2684
4 x
#8 x 2-1/2” Wood Screw
4 x
#8 x 3” Wood Screw
S3
S4
S3
S3
S4
S4
2677
2618
2618
2684
2627
2622
2618
Front
Back
2618
2647
2646
Swing Wall
Fig. 31.4
Left Side
2684
2684
2677
2677
2647
2646
2677
2677
2684
2684
Flush
Flush
2677