![KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual Download Page 68](http://html1.mh-extra.com/html/kidkraft/cedar-summit-bear-cave-lodge-fsc/cedar-summit-bear-cave-lodge-fsc_installation-and-operating-instructions-manual_1965916068.webp)
68
2 x
Roof End 1-1/4 x 3 x 10”
2 x
Roof End Left 1-1/4 x 3 x 10”
12 x
#8 x 2” Wood Screw
Fig. 31.2
2647
2627
Hardware
Wood Parts
A:
On (2627) SW Wall Panel and (2622) End Panel Assembly place 1 (2646) Roof End flush to the top of the
panel on the right hand side, measure overhang so it is 2-5/8” then attach with 3 (S11) #8 x 2” Wood Screws per
board. (fig. 31.1, 31.2 and 31.3)
B:
Repeat Step A for 2 (2647) Roof End Lefts. (fig. 31.1, 31.2 and 31.3)
Step 31: Attach Roof Ends
Part 1
S11
Flush
Flush
2-5/8”
Overhang
2646
2622
2618
Front
Back
S11
2647
Fig. 31.3
Top View
2646
2-5/8”
Overhang
2618
2647
Swing Wall
Fig. 31.1
Left Side
2684
2684
2677
2677
S11
2622
2622
S11
Side View
2677
2677
2684
2684
2646
2646
2647