97
Hardware
9 x
#8 x 2” Wood Screws
S11
A:
On the left side wall, place 1 (6022) SL Brace against the (6017) Floor Support making sure that it’s flush with
the top of the floorboards. Attach using 2 (H3) ¼ x 2-1/2” Hex Bolt (with flat washer, lock washer and t-nut). (Fig.
52.1 & 52.2 & 52.3)
B
: Center the (6005) Slide Block vertically in the slide opening ensuring that it’s flush to the bottom of (6022) SL
Brace and attach to the (6017) Floor Support using 2 (S11) #8 x 2” Wood Screws. (Fig. 52.1 & 52.2 & 52.3)
C
: From inside the assembly place 1 (6032) TNR Wall so it’s pressed against the inside of the (6005) Slide Block,
(6026) Rock Rail and (6002) Long Post. Ensure that the bottom of the (6032) TNR Wall is flush with the bottom of
the (6005) Slide Block and attach with 7 (S11) #8 x 2” Wood Screws. (Fig. 52.1 & 52.2 & 52.3).
Step 52: Attach SL Brace
left side wall
6022
6032
6005
Wood Parts
6022
6005
6032
1 x
SL Brace 1-1/4 x 2-1/2 x 24-1/4”
1 x
TNR Slide Block 1-1/4 x 3-1/4 x 8-3/4”
1 x
TNR Wall 1-1/4 x 4-1/4 x 34-3/4”
2 x
¼ x 2-1/2” Hex Bolt (LW1, FW1, TN1)
H3
Fig. 52.2
6032
6026
6002
inside
Flush
S11
S11
Fig. 52.3
Flush
flush to
floor board
6022
6032
6005
H3
H3
center in
slide opening
6017
S11
Fig. 52.1
FW1
LW1
TN1
LW1
FW1