59
EN
The encoder cable connects to terminal CN4, as shown in the
figure, with the sequence:
BLACK cable (-)
WHITE cable (A)
GREEN cable (B)
RED cable (+)
8.3 - Connection of the panel to the transmission belt
8.4 - Tensioning the belt
To tension the belt, first proceed by loosening the two screws
“A” and then apply the tension by tightening the screw “B” until
reaching the pre-set control dimension indicated in the table below,
according to the length of the beam, then retighten the two screws
“A”.
A
A
B
Lc
Ltr
beam
length (m)
Lc
tension control
measurement (mm)
Lm
corresponding spring
length (mm)
up to 2.9 m
30mm
25.5mm
from 2.9 m up to 6 m
29mm
24.5mm
over 6 m
28mm
23.5mm
24 V
MOTOR
POWER SUPPLY
ENCODER
In the case of a 1 + 1 panel with opening to the left, the belt
connection bracket must be placed over the connection bracket
between the slow and fast panel
ATTENTION !
Install the belt by inserting it between the motor pulley and the
guide pulley. The two ends of the belt that will need to be joined
together must be on the lower branch.
To make the joint between the two ends, use the appropriate
brackets and proceed as shown in the figure below.
Once the two ends are joined, connect the junction plate to the
panel runner in the position indicated in the “Installation Dimensions
- top and front views” section according to the type of door being
installed.
N.B.: In the case of a double opening door (2 + 2), before
connecting the second panel to the belt it is necessary to
tighten the belt (see section “belt tensioning”).
Summary of Contents for TELESCOPIC LEVANTE
Page 39: ...39 IT NOTE ...
Page 77: ...77 EN NOTE ...
Page 115: ...115 ES NOTAS ...
Page 153: ...153 FR REMARQUES ...
Page 154: ...EN 154 NOTE ...