47
EN
hv = H + 6 - 22 - 22- 10 (adjustment ± 4,5 mm)
900P
A007
90
± 4,5 mm
241,5
min 47
88
23
17
H
min 30
900P
A007
900LEV8
22
hv
6 ± 4,5
48
10
10
14
22
10 min
4.3 -
Installation with breakout profile
See the relative instructions of the KITANTSF2C certified KIT.
4.2 -
Dimensions installation with glass panels - Side View
5 - FIXING INSTRUCTIONS
The beams must be prepared before proceeding with the
installation. Take both beams (telescopic and front), remove the
limit switches, remove the sliding track and the anti-vibration
profile to avoid damage.
Take the telescopic beam and drill the Ø6.5mm holes for
positioning of the columns: use the reference line and drill 20mm
from the edge. In case of double opening add two more holes in
the “Lc” position indicated in the installation diagrams. Drill holes in
the same position on the front beam profile.
Countersink the holes in the rear of the beam exclusively of the
5.1 - Preparation of profiles
telescopic beam profile up to an external diameter of the flaring
of 12.5mm: check that the head of the countersunk screw M6x20
does not protrude from the profile, otherwise increase the flaring.
20 mm
6,5 mm
12,5 mm
Summary of Contents for TELESCOPIC LEVANTE
Page 39: ...39 IT NOTE ...
Page 77: ...77 EN NOTE ...
Page 115: ...115 ES NOTAS ...
Page 153: ...153 FR REMARQUES ...
Page 154: ...EN 154 NOTE ...