background image

     

3

㪌≑䖤㸠˖೼ᦤկ∈㪌⇨ᯊᑨ䙓ܡさ✊ᠧ
ᓔ᳔໻⌕䞣DŽᑨ㓧᜶ᑊϡᮁ๲䞣ഄᠧᓔ㪌
≑կᑨDŽৃ䗮䖛㪌≑կᑨㅵ䘧ϞϔϾ㓧᜶
ᠧᓔⱘ䯔䮼ᅲ⦄䖭DŽ

⊼ᛣ৘೑⊩ᕟ㾘ᅮDŽ

⊼ᛣЎ᠔⫼⋫⍸ࠖᦤկⱘᅝܼᦤ⼎ ˄䗮
ᐌ೼ࣙ㺙ᷛㅒϞ˅DŽ

Ў䙓ܡ䫭䇃᪡԰㗠ѻ⫳ॅ䰽ˈাܕ䆌᥹
ফ䖛᪡԰෍䆁੠Ꮖ㒣䆕ᯢ݊᪡԰㛑࡯ᑊ
᥹ফՓ⫼ྨᠬⱘҎਬ᪡԰䆒໛DŽ

↣ԡ᪡԰Ҏਬഛᖙ乏ৃҹপᕫ᪡԰䇈ᯢ
кDŽ

ϔᮺ䫭䇃᪡԰៪㗙Ⓓ⫼ˈ߭ৃ㛑಴ϟ߫ॳ
಴㗠ѻ⫳࿕㚕ࠄ᪡԰Ҏਬ੠݊ҪҎⱘॅ䰽˖

催य़

⋫⍸ࠖ៪᠔⫼⏙⋫⎆

䆒໛Ϟ♐⛁ⱘ䳊䚼ӊ ˄བՓ⫼♐⛁ⱘ⏙
⋫⎆៪㪌≑˅

⟚⚌ॅ䰽

ॅ䰽

಴偅ࡼ⏙⋫༈㗠ѻ⫳᣸य़ॅ䰽DŽ⏙⋫༈
偅ࡼ఼াܕ䆌೼ᇕ䯁ᆍ఼Ёᡩܹ䖤㸠DŽ

ᔧ㔤⏙⋫㺙㕂䖯ܹᆍ఼ᯊ೼㔤⏙⋫㺙㕂
Ϣᆍ఼П䯈ѻ⫳᣸Ӹ᠟ⱘॅ䰽ˈ಴ℸˈ
ᔧ㔤⏙⋫㺙㕂䖯ܹᆍ఼ᯊ೼ᑩᵓϞᮍ᥹
㾺੠ᓩᇐ㔤⏙⋫㺙㕂DŽ

಴催य़஋ᴳ៪㪌≑⑶ߎ㗠ѻ⫳ফӸॅ
䰽ˈ಴ℸˈ㔤⏙⋫㺙㕂াܕ䆌⫼೼ᇕ䯁
ᆍ఼Ёˈϡৃ⏙⋫ফᤳⱘᆍ఼DŽ

ᔧᆍ఼ϡᆚᇕᯊ಴㪌≑⑶ߎ㗠ѻ⫳ফӸ
ॅ䰽ˈ಴ℸˈᇣᖗᇚᑩᵓ།㋻೼ᆍ఼乊
ᑊ೼ᡩܹՓ⫼ࠡ݇䯁ᢑぎষⱘᇕⲪDŽ

಴㹿⏙⋫ⱘᆍ఼Ёᄬ೼ⱘ⅟ԭ⠽៪಴᠔
⫼⏙⋫⎆㗠ѻ⫳ॅᆇعᒋⱘॅ䰽DŽ಴
ℸˈᠻ㸠㾘ᅮⱘֱᡸ᥾ᮑDŽ

೼Փ⫼⛁⏙⋫⎆៪㪌≑䖯㸠԰Ϯᯊ಴♐
⛁ⱘ䕃ㅵ੠♐⛁ⱘᶊᄤ㗠ѻ⫳♐Ӹॅ
䰽DŽ೼Փ⫼⛁⏙⋫⎆៪㪌≑䖯㸠԰Ϯ
ᯊˈϡ㽕᥹㾺ᶊᄤ੠կᑨㅵ䘧ᑊこ᠈Ⳍ
ᑨⱘ䰆ᡸ᳡DŽ

೼㞾ࡼ᥻ࠊ⌕⿟Ё಴ᛣ໪ਃࡼ㗠ѻ⫳ফ
Ӹॅ䰽DŽ೼䖭㉏ᚙމϟ䗮ⶹ᪡԰ҎਬDŽ

೼⬉⑤⬉य़ᮁ⬉ৢ಴ᛣ໪ਃࡼ㗠ѻ⫳ফ
Ӹॅ䰽DŽϔᮺথ⫳ᬙ䱰ˈे݇䯁⏙⋫༈
੠催य़⋉ˈ݇䯁㪌≑կᑨDŽ

಴㔤⏙⋫㺙㕂ᥝ㨑㗠ѻ⫳ফӸॅ䰽DŽछ
䰡ᴎᖙ乏݋᳝㟇ᇥNJᡓ䕑࡯DŽ䞡
⠽ᣖ䩽ᖙ乏݋ֱ᳝䰽㺙㕂ˈҹ䰆ᛣ໪㜅
䩽DŽ

ᔧ䕗䭓ᯊ䯈䖯㸠⛁∈԰Ϯᯊ៪㗙ᔧ㒭䳔
㽕⏙⋫ⱘ㔤ᄤ䗮ܹ㪌≑ᯊˈ㔤ݙ⇨ԧ 
㪌≑⏋ড়⇨ԧϹ䞡ফ⛁DŽℸৢϔᮺ≵᳝
ㄝᕙܙߚދैˈे⫼ދ⏙⋫⎆䗮䖛஋ᇘ
༈஋ࠄ㔤ᄤЁˈ㔤ݙ⇨ԧ  㪌≑⏋ড়⇨
ԧᇚᗹ࠻ދैDŽ䖭ৃ㛑ᇐ㟈㔤ݙ䋳य़DŽ
ॳ߭Ϟᑨ䙓ܡӮѻ⫳Ꮌ໻㗠ᖿ䗳ⱘ⏽ᑺ
さবⱘ䖤㸠⌕⿟ˈᇸ݊ᰃ⬅⛁বދDŽ೼
ӏԩᚙމϟഛᑨࡵᖙ݇⊼㒭㔤ᄤⱘܙߚ
䗮亢ˈ៪㗙݋᳝䎇໳ⱘᓔষҹ֓䖯㸠य़
࡯㸹ٓDŽ

ᔧՓ⫼ⱘⳌᑨ⋫⍸ࠖ੠ᆍ఼ݙ⅟ԭ⠽ᑊᄬ
ᯊᄬ೼⟚⚌ॅ䰽੠☿♒ॅ䰽DŽ೼䖭ѯᚙމ
ϟ䇋৥.噀UFKHU݀ৌњ㾷བԩՓ⫼Ⳍᑨ⋫
⍸ࠖDŽ

㔤⏙⋫㺙㕂䖯㸠њ᥹ഄ੠䙓䳋DŽ

⊼ᛣ䰆☿䰆⟚㾘㣗 ˄ᖙ㽕ᯊᛄ࣪ǃ㪌䬔
ㄝ˅DŽ

াՓ⫼ Ā ⏙⋫⌕⿟ ā ϔゴ᠔߫⏙⋫⌕
⿟ˈ⏙⋫݊Ё᠔䗄ⱘѻકDŽ

⊼ᛣ
೼㔤⏙⋫㺙㕂੠⏙⋫༈Ϟᄬ೼ᤳണॅ䰽DŽ

⏙⋫༈೼ӏԩᚙމϟഛϡᕫ⺄ࠄᆍ఼ຕ
៪ᆍ఼ݙ䚼ᅝ㺙ӊˈ಴ℸˈ⊼ᛣ೼ᆍ఼
ݙ䖯㸠⬙䗮Ꮧ㕂DŽ

ᔧ㔤⏙⋫㺙㕂䖯ߎᯊ੠ᔧ㗏䕀ࠄᎹ԰ԡ
㕂ᯊˈᑨ⊼ᛣ⏙⋫༈ϡ㽕⺄ࠄᆍ఼៪ᆍ
఼ݙ䚼੠ᆍ఼乊乜䚼ⱘᅝ㺙ӊDŽ

㔤⏙⋫㺙㕂া೼䖯ߎԡ㕂ϞᑊՓ⫼ᇕ䯁
ⱘ䖤䕧ֱ䰽㺙㕂䖯ߎ㔤ᄤDŽ

া೼ᡬ঴ᶊⱘᎹ԰ԡ㕂Ϟ▔⌏⏙⋫༈ⱘ
偅ࡼ఼DŽ

㾚᠔⫼⏙⋫⎆ⱘ⌧ᑺ੠عᒋॅᆇᗻˈこ᠈
ϟ߫䰆ᡸ㺙໛˖

䰆∈䰆ᡸ᳡

ᡸⳂ䬰៪䴶㔽

ᆚᇕϨ䰆㜤㱔ⱘ᠟༫

ᆚᇕϨ䰆㜤㱔ⱘ䵟㹰

ܕ䆌ⱘ᪡԰Ҏਬᰃᣛᑈ⒵  ਼ቕϨ㛑໳᪡
԰䖭⾡䆒໛ⱘҎਬ ˄෍䆁⫳䰸໪ˈখ㾕ৠ
ϮᎹӸџᬙֱ䰽㘨ড়Ӯ㾘㣗%*9'
c˅DŽ

݇䯁ऩ⣀ⱘ催य़⋉DŽ

݇䯁㪌≑կᑨㅵ䘧DŽ

݇䯁⏙⋫⎆կᑨㅵ䘧DŽ

ᅝܼ䇈ᯢ

ϾҎ䰆ᡸ㺙໛

ᔧ⏙⋫ా䷇๲ᔎൟ䚼ӊᯊ
᠈Ϟ㘇㔽ˈҹ䰆ᤳӸ਀
࡯DŽ

ܕ䆌ⱘ᪡԰Ҏਬ

㋻ᗹᚙމϟⱘ㸠Ў

29

ZH

Summary of Contents for ICH 120/14 Ps F2

Page 1: ...w w w kaer cher com r egi st er and w i n ICH 120 14 Ps F2 59560670 01 14 Deutsch 3 English 15 27...

Page 2: ...2...

Page 3: ...ank Reinigungsvorrichtung ange schlossen F r die Sicherheit der ge samten Anlage ist der Betreiber verant wortlich Die Tank Reinigungsvorrichtung darf nur w hrend des Reinigungsvorgangs im Beh lter se...

Page 4: ...mit den 4 zum Kesselwagen geh ren den Spannschrauben dicht auf den Tankdom gespannt Durch das optional erh ltliche Unter berdruckventil 8 findet der Druckausgleich zwischen Be h lter und Umgebung stat...

Page 5: ...nk Reinigungsvorrichtung Das Hebezeug muss eine Tragkraft von mindestens 250 kg besitzen Der Last haken muss eine Sicherung gegen un beabsichtigtes Aush ngen aufweisen Bei l ngerem Hei wasserbetrieb o...

Page 6: ...4 A Zone 1 B Rotierender Reinigungskopf C Zone 0 D Beh lter Prinzipskizze Zoneneinteilung A C B D ICH 120 14 Ps F2 6 DE...

Page 7: ...as Einhalten der maximal zul ssigen Dampftemperatur ist durch den Anla genbetreiber auf geeignete Weise zu berwachen und sicherzustellen Der Anlagenbetreiber muss f r den Fehler fall dass die maximal...

Page 8: ...14 140 Bauseits vorgeschalteter Wasserfilter m 100 Hochdruckanschluss Zoll G 1 1 2 Absaugung Absaugungsanschluss Zoll G 2 Dampf Dampftemperatur max C 191 Dampfdurchsatz kg h 2200 Dampfdruck max MPa ba...

Page 9: ...en verminderte Best ndigkeit Gegebenenfalls bei K rcher r ckfra gen 1 Wasser mit saurem Reinigungsmittel max 0 1 Beispiel K rcher Reinigungsmittel RM25 2 S uren max Temperatur 20 C Salpeters ure max 1...

Page 10: ...ks festspannen Tank Reinigungsvorrichtung nur bei ausgeschalteter separater Hochdruck pumpe abgesperrter Dampfzufuhr und ausgeschaltetem Eigenantrieb in den Tank einbringen oder in anderen Tank berwec...

Page 11: ...und Verkleben und damit ein vorzeitiger Ver schlei der Dichtungen vermieden u er liche Korrosion durch aggressive Reststof fe wird verhindert Soll eine Anlage w hrend der Frostperiode stillgelegt wer...

Page 12: ...oder nach 40 Betriebsstunden Sichtpr fung der Hoch druckschl uche Hochdruckschl uche auf Besch digungen berpr fen be sch digte Schl uche austauschen Betreiber Transportsicherung ber pr fen Transports...

Page 13: ...gen an dem Ger t beseitigen wir in nerhalb der Garantiefrist kostenlos sofern ein Material oder Herstellungsfehler die Ursache sein sollte St rungssuche St rung M gliche Ursache Behebung von wem Reini...

Page 14: ...gesetzlichen Vorschriften eine Bedampfung als Schutzma nahme durchzuf hren Reinigungsabl ufe Reststoffe Reinigungsfl ssigkeiten Produkt 1 Reinigungsschritt 2 Reinigungsschritt 3 Reinigungsschritt Pro...

Page 15: ...he tank cleaning de vice by supply lines The operator is re sponsible for the safety of the entire system The tank cleaning device must only be present in the tank during the cleaning process Note Onl...

Page 16: ...he tank dome by means of the 4 clamping screws be longing to the tank wagon The option ally available vacuum pressure relief valve 8 equalizes the pressure be tween the container and the atmos phere T...

Page 17: ...ting unit must have a load capacity of at least 250 kg The load hook must have a se curity system against inadvertent un hooking With longer hot water operation or steaming of the tank to be cleaned t...

Page 18: ...4 A Zone 1 B Rotating cleaning head C Zone 0 D Container Basic sketch zone layout A C B D ICH 120 14 Ps F2 18 EN...

Page 19: ...tergent temperature and the compliance with the maximum admissi ble steam temperature is to be moni tored and ensured by the plant operator in an adequate way The plant operator must install a shutdow...

Page 20: ...Site supplied preswitched water filter m 100 High pressure connection Inch G 1 1 2 Suction Suction connection Inch G 2 Steam Steam temperature max C 191 Steam throughput kg h 2200 Steam pressure max M...

Page 21: ...neutral ised immediately Contaminated acids will decrease the resilience Enquire with K rcher if needed 1 Water with acid cleaning agents max 0 1 Example K rcher cleaning agents RM25 2 Acids max temp...

Page 22: ...touch the container wall or the items inside the container Please make sure these are arranged with sufficient clearance between them When retracting and extending the tank cleaning device and when f...

Page 23: ...with a frost protection solution Frost protection solu tions generally protect from corrosion at the same time Caution Risk of injury and damage Note the weight of the appliance in case of storage Cau...

Page 24: ...after 40 operat ing hours Visible inspection of the high pressure hoses Check the high pressure hoses for damages replace dam aged hoses Operator Check the transport safety device Check the transport...

Page 25: ...il ures of the appliance within the warranty period free of charge provided that such failure is caused by faulty material or de fects in fabrication Troubleshooting Fault Possible cause Remedy of who...

Page 26: ...ure in accordance with local laws Cleaning sequences Residual materials Cleaning liquids Product 1st cleaning step 2nd cleaning step 3rd cleaning step Products in Group I Motor oils Water vapour max 1...

Page 27: ...1 5 ZZZ NDHUFKHU FRP 5 3V ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH 27 ZH...

Page 28: ...2 B A 5 1 3 2 4 4 6 7 9 7 8 9 28 ZH...

Page 29: ...3 NJ UFKHU 9 c 29 ZH...

Page 30: ...4 A C B D ICH 120 14 Ps F2 30 ZH...

Page 31: ...5 HWU6LFK9 1 HWU6LFK9 1 5 1 03D e e UFKHU HWU6LFK9 5 S6 P 31 ZH...

Page 32: ...6 3V e e e 03D P e NJ K 03D 5S e P K PP PP NJ a F 7 e 7D e 32 ZH...

Page 33: ...7 e UFKHU 50 UFKHU UFKHU 50 e UFKHU UFKHU A C E G 2 C F 150 150 ca 4405 1226 715 688 550 D R 1 1 2 DKL 60 4x 3 0 446 B min 3170 G min 3600 H 780 I ca 1950 33 ZH...

Page 34: ...8 P D E F NJ NJ G H I c a b c d e f g 34 ZH...

Page 35: ...9 J K I I K UFKHU UFKHU f h g 35 ZH...

Page 36: ...10 UFKHU 36 ZH...

Page 37: ...11 8 6 5HLVHU OIUHG UFKHU PE R OIUHG UFKHU 6WU LQQHQGHQ HUPDQ LQQHQGHQ 3V 8 1 62 1 1 1 7 9 6 5LGOHUVWU 0uQFKHQ F 7 e 7D e CEO Head of Approbation 37 ZH...

Page 38: ...12 03D e 1 e e 0 0 03D e e e 38 ZH...

Page 39: ......

Page 40: ...http www kaercher com dealersearch...

Reviews: