-
10
Danger
Risk of accident while working on the unit!
During all tasks:
Remove voltage from and secure high
pressure pump at the main switch.
Shut off the cleaning liquid supply.
Close the steam supply.
Operator
Work designated with the sign “Opera-
tor” may only be carried out by persons
who have been instructed in the safe
operation and maintenance on the high
pressure plant.
Customer Service
Work designated with the sign “Cus-
tomer Service” may only be done by the
fitters of Kärcher Customer Service.
Maintenance schedule
Time
Activity
Performance
of whom
daily
Monitor the folding mecha-
nism of the folding rack for
ease of movement.
Monitor the movements of the draw pipe during extending and
lowering for smoothness and absence of jerks.
Operator
Perform a visual inspec-
tion of the seal underneath
the baseplate of the tank
cleaning device and on the
adapter.
Danger
Risk of injury and explosion on account of defective seal.
Check the seals for the type of application, contamination,
damage and wear. Replace defective seals.
Operator
weekly or after 40 operat-
ing hours
Visible inspection of the
high pressure hoses
Check the high pressure hoses for damages; replace dam-
aged hoses.
Operator
Check the transport safety
device.
Check the transport safety device for its function and flawless
condition.
Operator
Check clamping screws.
Check 4 clamping screws for fastening of the base plate on the
dome of the tank to be cleaned for ease of movement.
Operator
Check the cleaning heads
for ease of movement.
Turn the nozzle rotor by hand carefully and very slowly.
Operator
Visual inspection of the
moving parts of the folding
rack.
Visual inspection of the moving parts of the folding rack, espe-
cially of all pintles and their fixation in the revolute joints.
Operator
monthly or after 160 oper-
ating hours
Check screws for tight fit.
Check that all screws are fitted tightly.
Operator
Check the joint bolt.
Check the joint bolt for wear. Replace defect parts
Operator
Check the folding rack.
Check the ease of movement of the folding rack.
Operator
Every 600 operating hours Maintenance of the clean-
ing heads.
Perform maintenance tasks in accordance with the operating
instructions of the cleaning head manufacturer.
Skilled per-
sonnel
Troubleshooting
Troubleshooting notes
Who may remedy faults?
24
EN
Summary of Contents for ICH 120/14 Ps F2
Page 2: ...2...
Page 27: ...1 5 ZZZ NDHUFKHU FRP 5 3V ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH ZH 27 ZH...
Page 28: ...2 B A 5 1 3 2 4 4 6 7 9 7 8 9 28 ZH...
Page 29: ...3 NJ UFKHU 9 c 29 ZH...
Page 30: ...4 A C B D ICH 120 14 Ps F2 30 ZH...
Page 31: ...5 HWU6LFK9 1 HWU6LFK9 1 5 1 03D e e UFKHU HWU6LFK9 5 S6 P 31 ZH...
Page 32: ...6 3V e e e 03D P e NJ K 03D 5S e P K PP PP NJ a F 7 e 7D e 32 ZH...
Page 34: ...8 P D E F NJ NJ G H I c a b c d e f g 34 ZH...
Page 35: ...9 J K I I K UFKHU UFKHU f h g 35 ZH...
Page 36: ...10 UFKHU 36 ZH...
Page 38: ...12 03D e 1 e e 0 0 03D e e e 38 ZH...
Page 39: ......