As per specification the pressure loss at the extrac-
tion point 7 should not exceed 15%, thus 12 bar. To
reduce the pressure loss, the nominal width of the
pipe is enlarged in the locations with large pressure
losses and the calculation is performed once again.
From diagram 2: Pressure loss for 100 m of piping DN
25 at 4,750 l/h = 4.5 bar.
Conversion to 35 m:
4.5 bar x 35 m / 100 m = 1.60 bar
Pressure loss on section 3 - 2 is:
1.60 bar
Pressure loss - partial distance 2 -1
Determining the piping length
Delivery rate 5,700 l/h
Pipe diameter DN 25
Piping
T-branch
separation
35,0
0,5
m
m
Sum
35,5 m
From diagram 2: Pressure loss for 100 m of piping DN
25 at 5,700 l/h = 5.9 bar.
Conversion to 35.5 m:
5.9 bar x 35.5 m / 100 m = 2.09 bar
Pressure loss on section 2 - 1 is:
2.09 bar
Pressure loss section 1 - HDC
Determining the piping length
Delivery rate 6,650 l/h
Pipe diameter DN 25
Piping
Elbow r/d = 1.5
Piping
T counter run
separation
70,0
0,5
28,0
1,3
m
m
m
m
Sum
99,8 m
From diagram 2: Pressure loss for 100 m pipe DN 25
at 6,650 l/h = 8 bar
Conversion to 99.8 m:
8 bar x 99.8 m / 100 m = 7.99 bar
Pressure loss on section 1 - HDC is:
8.00 bar
Sum of pressure losses 7 - HDC
7 - 6
DN 15
0,86
bar
6 - +
DN 15
5,36
bar
+ - 3
DN 20
3,57
bar
3 - 2
DN 25
1,60
bar
2 - 1
DN 25
2,09
bar
1 - HDC
DN 25
8,00
bar
Sum
21,47 bar