6.10.1 Dismantling the sound enclosure
Note how the parts fit together.
➤ Dismantle the sound enclosure
6.10.2 Fitting the sound enclosure
Prior to any work requiring the opening of the pressure system, the machine must be fully iso‐
lated from the compressed air network and completely depressurised.
Precondition Cut-off the electrical power supply via the power supply isolating device,
ensure that the device is locked off,
verify the absence of any voltage.
The machine is vented completely to atmospheric pressure.
Verify the absence of pressure using a suitable measuring device (pressure gauge).
The machine has cooled down.
The user's shut-off valve between the machine and the air network is closed.
1. DANGER!
Electric voltage!
Risk of fatal injury caused by contact with live components!
➤ Switch off and lock out the power supply disconnecting device and check that no voltage
is present.
2. Remove the cable from the motor terminal box.
3. WARNING!
Compressed air!
Compressed air and devices under pressure can injure or cause death if the contained energy
is released suddenly.
➤ Fully vent all pressurised components and enclosures.
➤ Verify the absence of pressure using a suitable measuring device (pressure gauge).
4. Disconnect the hose line from the check valve.
5. Remove the rubber pad.
6. Depending on the machine type, the base plate of the compressor may need to replaced
and/or the air filter may require modification.
6.10.2.1 EPC 340-G
Material Supplied base plate
6
Installation
6.10 Retrofitting the sound enclosure (accessory)
No.: 9_5752 24 E
Assembly and operating manual 1-stage piston compressor
EPC-G
45