Min. switch-on voltage
after grid monitoring
Max. switch-on voltage
after grid monitoring
207 [V] - 253 [V]
F
Set min. and max. switch-on voltage after grid monitoring.
4
1
2
3
Min. switch-on fre-
quency after grid mon-
itoring
Max. switch-on fre-
quency after grid mon-
itoring
47.50 [Hz] – 50.07
[Hz]
F
Set min. and max. switch-on frequency after grid monitoring.
4
1
2
3
Min. switch-on voltage
after grid error
Max. switch-on voltage
after grid error
F
Set min. and max. switch-on voltage after grid monitoring.
4
1
2
3
Min. switch-on fre-
quency after grid error
Max. switch-on fre-
quency after grid error
F
Set min. and max. switch-on frequency after grid monitoring.
4
1
2
3
Monitoring time PV
voltage
F
Set time for voltage monitoring.
Monitoring time grid
voltage
F
Set time for voltage monitoring.
4
1
2
3
4
Waiting time after grid
error
F
Set wait time for grid monitoring.
4
1
2
3
4
Advanced islanding de-
tection
NOTE: NOTE: Grid operators require shutdown of the device
with standalone grid detection. More detailed information at:
4
1
2
3
4
ROCOF operation
mode passive Off |
On
F
Activate passive grid influence by application of a frequency.
ROCOF operation
mode active Off |
On
F
Activate active grid influence by application of a frequency.
4
1
2
3
4
Exten. ROCOF
F
Activate active grid influence by additional reactive power feed-in.
4
1
2
3
4
Frequency shift
Off | On
F
Activate frequency shift.
4
1
2
3
4
Pulse period repetition
time
40 – 6000 [ms]
F
Define period for detection.
Manual