D 3
020
5.GB
3.1
Bypassing the drive current interruption
– Switch on the switch “Cut-back speed” (3).
F
If the battery is protruding, the truck may only be driven at cut-back speed in the bat-
tery charging station!
3.2
Battery trolley emergency unlocking
system
– Render the truck ready for operation
(refer to chapter E).
– Tilt control lever (1) in direction of
arrow (U), drive mast holder to its limit
stop position towards the battery and
release control lever (1).
– Tilt control lever (1) once again in di-
rection of arrow (U) and go on driving
mast holder to its limit stop position to-
wards the battery.
– Switch off the master switch and the key switch.
– Open seat hood (see chapter F)
– Loosen screws (6) of the battery lokking system and pull out locking system (7).
– Close seat hood.
– Connect master switch and key switch.
– Tilt the control lever (1) in the T direction and push the mast holder with the coupled
battery trolley forward until the battery is exposed for servicing.
– LED (2) lights up.
– Disconnect main switch and key switch.
Z
Eliminate the malfunction of the battery unlocking system before mounting the battery
locking system.
Z
The safety switch of the battery unlocking system interrupts the driving function as
long as the battery trolley is unlocked and the LED (2) is lit. Before commissioning the
truck again, the battery trolley must be returned to the original position to uncouple
the battery trolley and the mast holder. The LED (2) must have gone out.
4
Charging the battery
– Expose the battery (refer to section 3).
F
During the recharging operation the tops of the battery cells must be exposed to en-
sure adequate ventilation. No metal objects must be placed on the battery. Prior to
starting the recharging operation, check all cable connections and plugged connec-
tions for visible damage.
– Remove any insulating mats from the battery.
– Connect the charging cable of the battery charger to the battery connector (5).
– Recharge the battery observing the instructions provided by the battery supplier
and by the battery charger supplier.
F
All safety instructions as provided by the battery supplier and battery charger supplier
must be strictly observed.
6
7
D 3
020
5.GB
3.1
Bypassing the drive current interruption
– Switch on the switch “Cut-back speed” (3).
F
If the battery is protruding, the truck may only be driven at cut-back speed in the bat-
tery charging station!
3.2
Battery trolley emergency unlocking
system
– Render the truck ready for operation
(refer to chapter E).
– Tilt control lever (1) in direction of
arrow (U), drive mast holder to its limit
stop position towards the battery and
release control lever (1).
– Tilt control lever (1) once again in di-
rection of arrow (U) and go on driving
mast holder to its limit stop position to-
wards the battery.
– Switch off the master switch and the key switch.
– Open seat hood (see chapter F)
– Loosen screws (6) of the battery lokking system and pull out locking system (7).
– Close seat hood.
– Connect master switch and key switch.
– Tilt the control lever (1) in the T direction and push the mast holder with the coupled
battery trolley forward until the battery is exposed for servicing.
– LED (2) lights up.
– Disconnect main switch and key switch.
Z
Eliminate the malfunction of the battery unlocking system before mounting the battery
locking system.
Z
The safety switch of the battery unlocking system interrupts the driving function as
long as the battery trolley is unlocked and the LED (2) is lit. Before commissioning the
truck again, the battery trolley must be returned to the original position to uncouple
the battery trolley and the mast holder. The LED (2) must have gone out.
4
Charging the battery
– Expose the battery (refer to section 3).
F
During the recharging operation the tops of the battery cells must be exposed to en-
sure adequate ventilation. No metal objects must be placed on the battery. Prior to
starting the recharging operation, check all cable connections and plugged connec-
tions for visible damage.
– Remove any insulating mats from the battery.
– Connect the charging cable of the battery charger to the battery connector (5).
– Recharge the battery observing the instructions provided by the battery supplier
and by the battery charger supplier.
F
All safety instructions as provided by the battery supplier and battery charger supplier
must be strictly observed.
6
7
Summary of Contents for ETVC 16
Page 1: ...Operating instructions 50052734 ETVC 16 20 G 05 99 12 07 ...
Page 3: ...0903 GB 2 0903 GB 2 ...
Page 5: ...0108 GB 0108 GB ...
Page 9: ...0106 GB I 4 0106 GB I 4 ...
Page 11: ...0506 GB 2 0506 GB 2 ...
Page 13: ...0800 GB 0800 GB ...
Page 25: ...0205 GB B 12 0205 GB B 12 ...
Page 33: ...0205 GB D 6 0205 GB D 6 ...
Page 89: ...0506 GB 18 0506 GB 18 ...