
12
4 Assembly
4.1
General
Mounting
location
Find a location that ensures easy accessibility for the later calibration.
The fastening must be secure and must ensure low vibration for the device.
Avoid direct sunlight!
Permissible ambient temperature at the installation location: -10 to +55 °C
with max. 95 % rel. humidity, no condensation.
Installation
position
The device can be mounted in any position.
4.2
Dimensions
Close mounting
Minimum spacing of panel cutouts
Horizontal
Vertical
Without setup connector:
30 mm
11 mm
With setup connector (see arrow):
65 mm
11 mm
Summary of Contents for dTRANS pH 02
Page 66: ...9 Calibrating a redox measurement chain 66...
Page 89: ...89 12 Calibration logbook Next most recent successful calibration Briefly press the key...
Page 100: ...14 Setup program 100 Export data for processing in an external program...
Page 133: ......
Page 134: ......
Page 135: ......