PREPARATION FOR INSTALLATION
2-8
2.2.2 AIS
Controller
In general, the AIS controller is installed on the chart table or at the Coning position that is center of
the front of the bridge.
In case of coning position, provide a rack under the face wall of the bridge (order from shipyard) or
make a suitable hole in the wall (executed by shipyard) to set the AIS controller.
In case the controller is embedded in the wall, remove the panel and install as shown below.
If the Connection Box (option) is installed within 2m of the AIS controller, they can be connected by
using the control cable CFQ-9183A. If it is necessary to connect further than 2m then use the optional
cable type, CFQ-9182D/F.
Through-hole
Through-hole
Maximum length: 20m
Maximum length: 50m
wall
AIS controller
Summary of Contents for JHS-183
Page 2: ... ...
Page 33: ...CONFIGURATION AND SPECIFICATIONS 1 21 1 4 2 Overall configuration ...
Page 58: ...INSTALLATIONS 3 8 3 Procedure 1 2 3 4 5 6 7 8 9 ...
Page 59: ...INSTALLATIONS 3 9 10 11 12 13 14 15 ...
Page 60: ...INSTALLATIONS 3 10 16 17 18 19 20 ...
Page 61: ...INSTALLATIONS 3 11 21 22 23 24 ...
Page 82: ...INSTALLATIONS 3 32 3 1 7 NQE 422A Junction box Unit mm Weight Approx 0 4kg Color 7 5BG 7 2 ...
Page 84: ...INSTALLATIONS 3 34 ...
Page 87: ...APPENDIX 4 3 4 1 2 NCM 983 AIS CONTROLLER 4 1 2 1 CHASSIS ...
Page 88: ...APPENDIX 4 4 4 1 2 2 BLOCK DIAGRAM FPC 26 A K ...
Page 101: ......