INSTALLATIONS
3-2
3.1.1.2 Installation of AIS Transponder
(1) Installation
drawing1
Gland 25a (JIS F 8802)
(Dock supply)
NTE-183 AIS Transponder
Ground bolt
(Dock supply)
Ground sheet
(Attachment)
Fixing belts
(Attachment)
1500mm or les
s
Pole or Mast
(Dock supply)
RG-10UY
(Dock supply)
Example of reinforcement
(Dock supply)
*3
Protection sheet
(Attachment)
Rubbers (Attachment)
*4
Cautions
1. *1: Seal this section with self-bonding
tape and then wrap with vinyl tape.
2. *2: When the cable length is 500 mm or
longer, fix it with metal belts along the
pole.
Do not apply tension to the cable during
installation of the equipment.
3. *3: Seal this section with a sealing
material made from silicon before fixing
the transponder.
4. The pole or mast must be shock/vibration
free.
5. The equipment must be installed forward
of the funnel to avoid smoke and soot.
6. The equipment must be installed where
environmental temperature is not higher
than 55 deg. C.
Take care during installation that the
ground bolt does not come into contact
with the radome, otherwise the radome
may be broken.
Summary of Contents for JHS-183
Page 2: ... ...
Page 33: ...CONFIGURATION AND SPECIFICATIONS 1 21 1 4 2 Overall configuration ...
Page 58: ...INSTALLATIONS 3 8 3 Procedure 1 2 3 4 5 6 7 8 9 ...
Page 59: ...INSTALLATIONS 3 9 10 11 12 13 14 15 ...
Page 60: ...INSTALLATIONS 3 10 16 17 18 19 20 ...
Page 61: ...INSTALLATIONS 3 11 21 22 23 24 ...
Page 82: ...INSTALLATIONS 3 32 3 1 7 NQE 422A Junction box Unit mm Weight Approx 0 4kg Color 7 5BG 7 2 ...
Page 84: ...INSTALLATIONS 3 34 ...
Page 87: ...APPENDIX 4 3 4 1 2 NCM 983 AIS CONTROLLER 4 1 2 1 CHASSIS ...
Page 88: ...APPENDIX 4 4 4 1 2 2 BLOCK DIAGRAM FPC 26 A K ...
Page 101: ......