PREPARATION FOR INSTALLATION
2-13
1.
Ship’s information
Ship’s name
Survey Date
Flag
Survey Place
G/T
Presented by
Ship Type
Written by
Company
Name
Class
IMO No.
Sea Area
[ ]A1, [ ]A2, [ ]A3, [ ]A4
MMSI
Call Sign
2. Present Installation
Power supply Type
Fitting
Capacity
Main
Generator
VAC
kVA
φ
Hz
Emergency
Generator
[ ]yes ,[ ]no VAC
kVA
φ
Hz
Batt.
24VDC
AH
Reserve
Batt.
Radio Batt
24VDC
AH
Equipment
Model / Maker
(D)GPS Receiver
- Required position data
based on WGS-84 datum
reference.
Type:
Maker:
Signal type: Port:
Ant position: From Bow m, From stern m
Height m, Starboard m, Port
m
Gyro Compass
Type: Maker:
Signal type:
Doppler Log (If equipped)
-
Available only Speed Over
Ground data
Type:
Maker:
Signal type:
ROT Sensor (If equipped)
Type: Maker:
Signal type:
GPS Buffer (Option)
Type:
Maker:
Signal type:
Output port:
Summary of Contents for JHS-183
Page 2: ... ...
Page 33: ...CONFIGURATION AND SPECIFICATIONS 1 21 1 4 2 Overall configuration ...
Page 58: ...INSTALLATIONS 3 8 3 Procedure 1 2 3 4 5 6 7 8 9 ...
Page 59: ...INSTALLATIONS 3 9 10 11 12 13 14 15 ...
Page 60: ...INSTALLATIONS 3 10 16 17 18 19 20 ...
Page 61: ...INSTALLATIONS 3 11 21 22 23 24 ...
Page 82: ...INSTALLATIONS 3 32 3 1 7 NQE 422A Junction box Unit mm Weight Approx 0 4kg Color 7 5BG 7 2 ...
Page 84: ...INSTALLATIONS 3 34 ...
Page 87: ...APPENDIX 4 3 4 1 2 NCM 983 AIS CONTROLLER 4 1 2 1 CHASSIS ...
Page 88: ...APPENDIX 4 4 4 1 2 2 BLOCK DIAGRAM FPC 26 A K ...
Page 101: ......