ix
Table of Contents
Before Operation ............................................................................................
v
Handling Precaution .....................................................................................
vi
Items To Be Explained To The Captain .......................................................
vii
Cautions in Working at a High Place ..........................................................
viii
1. Configuration and Specifications .............................................................
1-1
1.1 Basic
configuration
.............................................................................................
1-1
1.1.1
Basic configuration of the equipment .......................................................... 1-1
1.1.2 Options
........................................................................................................
1-1
1.1.3 Spare
parts
..................................................................................................
1-2
1.1.4 System
configuration
................................................................................... 1-3
1.2 Block
diagram
....................................................................................................
1-4
1.2.1 General
configuration
..................................................................................
1-4
1.2.2 Overall
configuration
...................................................................................
1-5
1.3 Specifications
.....................................................................................................
1-6
1.3.1
JHS-183 Automatic Identification System ................................................... 1-6
1.3.2 Options
........................................................................................................
1-19
1.4 Interconnection
diagram
....................................................................................
1-20
1.4.1 General
configuration
..................................................................................
1-20
1.4.2 Overall
configuration
...................................................................................
1-21
2. Preparation for installation ........................................................................
2-1
2.1 Overview
............................................................................................................
2-1
2.2
Installation Location of AIS Transponder and Controller .................................... 2-3
2.2.1 AIS
Transponder
.........................................................................................
2-3
2.2.2 AIS
Controller
..............................................................................................
2-8
2.3 Installation
planning
...........................................................................................
2-9
2.4 Incidental
work
...................................................................................................
2-10
2.5
Planning for Overall Work .................................................................................. 2-10
2.6
Work Flow for AIS Installations for Ships in Commission ................................... 2-11
2.7 Installation
survey
report
....................................................................................
2-12
3. Installations ................................................................................................ 3-1
3.1
External dimensions and equipment overview ................................................... 3-1
3.1.1 NTE-183
AIS
Transponder
..........................................................................
3-1
3.1.1.1 External dimensions and installation space .........................................................
3-1
3.1.1.2 Installation of AIS Transponder ............................................................................
3-2
3.1.1.3 Connection procedure of N type coaxial connector .............................................
3-7
vii
Summary of Contents for JHS-183
Page 2: ... ...
Page 33: ...CONFIGURATION AND SPECIFICATIONS 1 21 1 4 2 Overall configuration ...
Page 58: ...INSTALLATIONS 3 8 3 Procedure 1 2 3 4 5 6 7 8 9 ...
Page 59: ...INSTALLATIONS 3 9 10 11 12 13 14 15 ...
Page 60: ...INSTALLATIONS 3 10 16 17 18 19 20 ...
Page 61: ...INSTALLATIONS 3 11 21 22 23 24 ...
Page 82: ...INSTALLATIONS 3 32 3 1 7 NQE 422A Junction box Unit mm Weight Approx 0 4kg Color 7 5BG 7 2 ...
Page 84: ...INSTALLATIONS 3 34 ...
Page 87: ...APPENDIX 4 3 4 1 2 NCM 983 AIS CONTROLLER 4 1 2 1 CHASSIS ...
Page 88: ...APPENDIX 4 4 4 1 2 2 BLOCK DIAGRAM FPC 26 A K ...
Page 101: ......