INSTALLATIONS
3-6
(5) Installation
procedure
Fix the ground sheet by the following parts:
1 washer W8
1 spring washer SW8
1 hexagon nut N8
Fixing procedure
(1) Stick Rubbers on the AIS transponder. The rubbers
should not touch the pole directly.
(2) Attach with Protection sheet around the pole.
(3) Open the fitting belts with a flathead screwdriver.
(4) Wind the fitting belts around the pole or mast and the
AIS Transponder.
(5) Tighten the fixing belt with torque of approx. 2.45 Nm
with a screwdriver. (See figure below)
(6) Fix the ground sheet with a washer, spring washer, and
a hexagon nut.
Tightening Torque: approx. 2.45Nm
Or adjust the deflection within 0.5mm by pressing the fixing
belt strongly with your fingers.
Caution: Do not tighten the belt with excessive torque,
this might break the belt.
Ground sheet
AIS Transponder
Rubbers 10 x 10 x 10
Protection sheet
Flathead screw driver
Clamp
Hexagon nut N8
Spring washer SW8
Washer W8
Covering tube
Fix the AIS
Transponder
with the covering tube
Pole or Mast
Covering tube
AIS
Bending
Approx. 0.5mm
Clamp
Fixing belt
Pole or Mast
Contacting
range
of the clamp
200
Pole or Mast
Summary of Contents for JHS-183
Page 2: ... ...
Page 33: ...CONFIGURATION AND SPECIFICATIONS 1 21 1 4 2 Overall configuration ...
Page 58: ...INSTALLATIONS 3 8 3 Procedure 1 2 3 4 5 6 7 8 9 ...
Page 59: ...INSTALLATIONS 3 9 10 11 12 13 14 15 ...
Page 60: ...INSTALLATIONS 3 10 16 17 18 19 20 ...
Page 61: ...INSTALLATIONS 3 11 21 22 23 24 ...
Page 82: ...INSTALLATIONS 3 32 3 1 7 NQE 422A Junction box Unit mm Weight Approx 0 4kg Color 7 5BG 7 2 ...
Page 84: ...INSTALLATIONS 3 34 ...
Page 87: ...APPENDIX 4 3 4 1 2 NCM 983 AIS CONTROLLER 4 1 2 1 CHASSIS ...
Page 88: ...APPENDIX 4 4 4 1 2 2 BLOCK DIAGRAM FPC 26 A K ...
Page 101: ......