Section 9 Maintenance & Inspection
9-46
Note
This equipment restarts during the recovery operation. Do not perform any other operations
until the recovery is completed.
Otherwise, recovery may fail, possibly causing an accident.
After completion of recovery, the following screen is displayed.
2
Turn off the power supply of this equipment by pressing the power button of the
operation unit.
9.10.4
Re-setting C-MAP
Re-set the settings of C-MAP by restarting this equipment.
Re-register the database and the licence.
Update as required.
System
Recovery succeeded.
Turn the power off and on again.
C-MAP charts has been initialized.
Set up the setting of the C-MAP
charts.
Summary of Contents for JAN-7202
Page 2: ......
Page 19: ...xvii CWA 246 26inch Display Unit Mount Kit Warning Label ...
Page 20: ...xviii CWA 245 19inch Display Unit Mount Kit Warning Label ...
Page 21: ...xix NQE 3141 4A 8A Interswitch Unit Warning Label ...
Page 22: ...xx EQUIPMENT APPEARANCE CWA 245 Display Unit CWA 246 Display Unit ...
Page 24: ...xxii NWZ 207 214 19inch Display NWZ 208 26inch Display NQE 1143 Junction box Option ...
Page 34: ...Contents 8 ...
Page 50: ...Section 1 Overview 1 16 Outline Drawing of 19inch Desktop Frame CWB 1594 ...
Page 56: ...Section 1 Overview 1 22 ...
Page 66: ...Section 2 Name and Function of Each Unit 2 10 ...
Page 118: ...Section 3 Basic Operations 3 52 ...
Page 166: ...Chapter 4 Conning Display 4 48 ...
Page 256: ...Section 9 Maintenance Inspection 9 48 ...
Page 272: ...Section 10 Failures and After Sale Services 10 16 ...
Page 274: ...Section 11 About Disposal 11 2 ...
Page 331: ......