xv
Do not turn off the power during Backup/Restore.
Otherwise, a function may fail, and an accident may occur.
Do not do the backup operation of data while sailing.
The Conning Display application should be ended to begin the data backup. It
becomes impossible to observe using the Conning Display and this may lead
to accidents.
The backup power supply (DC power supply, etc.) of the equipment must be
connected when recovery of the C drive image is performed. If the power
supply stops during recovery, an equipment activation fault occurs, causing
an accident.
Do not turn off the power supply during recovery of C drive image.
Otherwise, a function fault occurs, causing an accident.
In the case of turning on the power under the condition of low temperature, do
pre-heat more than 30 minutes.
Otherwise, an operation failure may occur and an accident may occur.
Summary of Contents for JAN-7202
Page 2: ......
Page 19: ...xvii CWA 246 26inch Display Unit Mount Kit Warning Label ...
Page 20: ...xviii CWA 245 19inch Display Unit Mount Kit Warning Label ...
Page 21: ...xix NQE 3141 4A 8A Interswitch Unit Warning Label ...
Page 22: ...xx EQUIPMENT APPEARANCE CWA 245 Display Unit CWA 246 Display Unit ...
Page 24: ...xxii NWZ 207 214 19inch Display NWZ 208 26inch Display NQE 1143 Junction box Option ...
Page 34: ...Contents 8 ...
Page 50: ...Section 1 Overview 1 16 Outline Drawing of 19inch Desktop Frame CWB 1594 ...
Page 56: ...Section 1 Overview 1 22 ...
Page 66: ...Section 2 Name and Function of Each Unit 2 10 ...
Page 118: ...Section 3 Basic Operations 3 52 ...
Page 166: ...Chapter 4 Conning Display 4 48 ...
Page 256: ...Section 9 Maintenance Inspection 9 48 ...
Page 272: ...Section 10 Failures and After Sale Services 10 16 ...
Page 274: ...Section 11 About Disposal 11 2 ...
Page 331: ......