H. STEAM INFORMATION
It is your responsibility to have
ALL
plumbing connections made by a qualified professional to ensure that the
steam plumbing installation is adequate and conforms to local and state regulations or codes.
Care
must be
exercised when leveling steam dryers into final position. After leveling the dryer, check the downward
pitch of the heat exchanger from front to rear with a level. Likewise, check the downward pitch of the return
condensate manifold toward its outlet part. Absence of these downward pitches will result in probable water
hammer and premature heat exchanger fracture and leakage.
The presence of condensate in the steam will cause water hammer and subsequent heat exchanger failure. The
steam supply connection
must be
taken from the top of a well-dripped steam main. If the supply run-out to the
dryer exceeds 20 feet (6.1 meters), it
should be
dripped just before the control valve with a proper trap and dirt
pocket.
IMPORTANT:
Failure to comply with the requirements stipulated in this manual can result in
component failure, which will VOID THE WARRANTY.
NOTE:
The dryer is manufactured with a pneumatic (piston) damper system, which requires an
external supply of air (80 psi +/- 10 psi [5.51 bar +/- 0.68 bar]).
1. Steam Coil pH Level
The normal pH level for copper type steam coils
must be
maintained between a value of 8.5 to 9.5. For steel
type steam coils the pH level
must be
maintained between a value of 9.5 to 10.5. These limits are set to limit
the acid attack of the steam coils.
IMPORTANT:
Coil failure due to improper pH level will VOID THE WARRANTY.
2. Steam Requirements
Shaded areas are stated in metric equivalents
*The minimum operating pressure for optimum results is 100 psig (689.47 kPa).
3. Installation Instructions
To ensure an adequate supply of steam is provided, be sure that the steam supply lines and steam return lines
are sized and laid out as stipulated in this manual. Inadequate steam supply lines and steam return lines or
improper steam plumbing will result in poor performance and can cause component failure. Clean, dry steam
must be
provided to the dryer.
IMPORTANT:
Steam coil failure due to water hammer by wet steam will VOID THE
WARRANTY.
Operating Steam Pressure
Maximum
125 psig*
862 kPa
Heat Input (Normal Load)
3.0 Bhp
Consumption (Approximate)
104 lb/hr
47.2 kg/hr