C. DRYER ENCLOSURE REQUIREMENTS
Bulkheads and partitions
should be
made of noncombustible material.
NOTE:
Allowances
must be
made for opening the control door.
A
30-inches (76.2 cm) for optimum opening of load door.
B
The maximum thickness of the bulkhead is 4-inches (10.16 cm). For electric dryers the maximum thickness of
the bulkhead is 1-inch (2.54 cm) within 3-inches (7.62 cm) from the top of the control door.
C
For gas and electric dryers a minimum overhead clearance of 12-inches (30.48 cm) is required, providing no
sprinkler is located above the dryer. For steam dryers or if a sprinkler is located above the dryer,
18-inches (45.72 cm) is required.
D
Dryer should be positioned 12-inches (30.48 cm) away from the nearest obstruction and 24-inches (60.96 cm)
is recommended for ease of installation, maintenance, and service.
E
2-inch (5.08 cm) minimum is required for opening the control door.
F
Flooring should be level or below dryer cabinet for ease of removing panels during maintenance.
G
Dryers may be positioned sidewall to sidewall, however a 1/16” (1.5875 mm) minimum allowance must be
made for the opening and closing of the control door, along with the removal of panels during maintenance.