
Dismantling (cont’d)
5
Place a receptacle of a volume greater than 1.7 litres
(0.37 gal) under the bench. Turn the gearbox assembly
over so that cover
8
is underneath. Remove the socket
head plugs
33
and let the oil drain completely.
6
Tur n the gearbox assembly so that cover
8
is
uppermost. Inscribe alignment marks on hub
1
and
cover
8
.
7
In the groove between cover
8
and hub
1
, locate the gap
in ring
18
. Horizontally in line with the ring (i.e. 7 mm
(0.27 in) from the top of the hub rim) and at a point 20
mm (0.8 in) from the gap, produce a punch mark.
8
Using the punch mark as a guide, drill a 2 mm (0.0008
in) diameter hole into the hub. Drill until the bit touches
ring
18.
8 - 2
Section F
Transmission
9803/6020
Section F
8 - 2
Issue 1
Track Gearbox
Summary of Contents for JS70
Page 65: ......
Page 99: ......
Page 189: ...Section E Section E Hydraulics 9803 6020 Issue 1 33 4 33 4 Control Valves Control Valve 291360...