4.3
Checking the System before Installing
We advise you to check the system before installing SeapiX on board the vessel. This
operation shall be done in a clean, dust-free and protected room. Please go to next chapters
and
run SeapiX Commissioning (chapter 5) and SeapiX Configuration (chapter 6).
If any anomalies, it will be detected during the check. iXblue recommands to perform it with
its Support Service through
TeamViewer
(see Support through TeamViewer, chapter 11).
In the example below, the SAU is immersed for testing into a (green) water tank.
We suggest test sequences no less than 15mn long.
Typical test bench including a water tank