SeapiX
–
Installation Manual
SSD-C-1306 Ed. A
–
01/2020
30
4.2.2
E
THERNET
C
ABLES
(
ITU↔BFU
AND
BFU↔VPU)
Both Ethernet cables
(ITU↔BFU and BFU↔VPU) shall be terminated during the installation
as per the following instructions.
Ethernet cable locking system onto the Interface unit (ITU)