22
21
20
24
19
23
5
Manual instruction |
Gasoline chain saw
EN
machine.
Cutting of billets that lay on the ground is
•
prohibited.
After operating the machine
After switching off the machine wait until the
•
saw chain comes to a complete stop: it will continue
running mechanically for a while. Do not make any
attempt to stop the chain on your own.
Store the machine after operation only with the
•
cutting unit covered.
Mounting and adjustment
Prior to any maintenance procedures
the machine must be switched off.
Wear protective gloves while handling
the saw chain.
19. Nut
20. Casing
21. Slot
22. Driving gear
23. Positioning pin
24. Saw chain tightening screw
Installing the saw chain
Lay the machine onto the flat ground.
•
Unscrew the nuts (19) with the help of the multi-
•
purpose wrench (18).
Move the chain brake initiator (4) to the utmost
•
forward position and remove the casing (20).
Mount the saw chain (1) on the guide bar (2),
•
paying attention to the direction of the saw chain
teeth.
Tighten the saw chain (1) so that the loop can be
•
formed on the rear side of the guide bar (2).
Match the complete cutting unit with the main
•
unit of the machine and reeve the saw chain (1) in
the driving gear (22).
Mount the guide bar (2) onto the main unit of
•
the machine so that the positioning pins (23) fit into
the slot (21).
Replace the casing (20).
•
Screw the nuts (19) with the help of the multi-
•
purpose wrench (18) and tighten them without
applying the excessive force, in order not to damage
the threaded joint.
Check the proper matching of the saw chain
•
links (1) with the groove of the guide bar (2), and
tighten the chain.
Checking and adjusting the chain tension
Prior to each use of the machine, as well
as after every 10 minutes of operation it
is necessary to perform a check, and if
necessary, to adjust the tension of the
chain (1).
After mounting the new saw chain, the increased
extension must be taken into consideration on the
early stage of operation.
Summary of Contents for GCHS-38
Page 23: ...23 RUS 19 20 21 22 23 24 19 18 4 20 1 2 1 2 1 22 2 21 23 20 19 18 1 2 22 21 20 24 19 23...
Page 24: ...24 RUS 10 1 2 1 3 1 19 18 24 18 1 24 1 24 20 18 y 1 10 15 15 15 14 2 3 14 12 13 9 8 3 4 mm...
Page 25: ...25 RUS 8 16 13 17 16 4 5 6 12 17 1 16 o 1 1 1 1 4 4 0 3 5 9...
Page 26: ...26 RUS 4 1 1 9 e a A B pa a A B A 1 3 A B 4 A...
Page 28: ...28 RUS 18 26 0 7 0 8 26 28 20 IVT 1 28 28 IVT 1 2 IVT IVT 1 3 e o 0 7 0 8 mm 28...
Page 32: ...32 KZ 19 20 21 22 23 24 19 18 4 20 2 1 1 2 1 22 2 21 23 20 19 18 1 2 22 21 20 24 19 23...
Page 33: ...33 KZ 10 1 2 1 3 1 19 18 24 18 1 24 1 24 19 18 1 10 15 15 15 14 2 3 12 13 9 8 3 4 mm...
Page 34: ...34 KZ 8 16 13 17 16 4 5 6 12 17 1 16 1 1 1 1 4 4 0 3 5...
Page 35: ...35 KZ 4 1 9 A B A B 8 A...
Page 37: ...37 KZ 26 0 7 0 8 26 28 20 IVT 1 28 28 IVT 1 2 IVT IVT 1 3 28 0 7 0 8 mm...
Page 47: ...47 Notes Bemerkung Annotazioni...
Page 48: ...Via cantonale 2 CH 6917 Barbengo Switzerland mail info ivt ht com web www ivt ht com Swiss SA...