The programming unit's base plate is installed on a flush-mounted or plasterboard wall box. The
programming unit is then hooked into the installed base plate using a snap-in connection. The
mains connection and RS485 data cables are located in the box and are distributed in the box.
34
inVENTer Connect controller platform | Installation instructions
INSTALLING THE DEVICES
Installing the programming unit
Phillips screwdriver
Requirements:
•
The box is fitted.
• The mains connection cables and, if necessary, the
RS485 data cable are connected to the base plate.
►
Turn the connected base plate by 180°.
►
Align the base plate horizontally in front of the box
using the built-in spirit level (1).
The installation marking, arrow with letter-
ing UP (top), is directed upwards.
►
Screw the programming unit's base plate to the box
using fixing screws.
The base plate is installed.
►
Hold the programming unit at a slight angle and
hook the upper hooks of the programming unit into
the eyelets on the base plate ( ).
►
Swivel the programming unit towards the base plate
and then press it onto the base plate ( ).
The programming unit should snap audibly into
place.
The controller is installed.
2
1
CLICK
1
2
!
1