Interroll Roller Conveyor SH 1110
Installation
24
Version 1.0 (06/2022) en
Translation of original operating instructions
Installing the side guide
2
1
2
3
4
5
1
Universal support with U-bracket
4
Torx screw
2
Side guide
5
Universal support with Z-bracket
3
(Bottom part) Side guide bracket
WARNING
Risk of injury from crushing and electrocution
Installation and maintenance tasks on a conveyor system while it is in operation can cause
crushing and electric shock.
4
Power down the entire conveyor module and ensure that it cannot be started accidentally.
Fasten screws with a tightening torque of 6 Nm.
Requirement:
R
The module is shut down.
4
Install the universal support,
see "Installing the universal support", page 22
4
Loosen screw (4) slightly.
The bottom part of side guide bracket (3) loosens.
4
Place side guide (2) in the opening created and position it.
4
Tighten the screw (4).
ð
Screw is secured. The side guide bracket sits firmly on the universal support.