Interroll Roller Conveyor SH 1110
Maintenance and repair
44
Version 1.0 (06/2022) en
Translation of original operating instructions
Replacing the roller
1
1
2
1
Taper screw
2
Roller
Replacing the roller is only necessary if the PolyVee heads show signs of wear or the roller is
damaged.
WARNING
Risk of injury from crushing and electrocution
Installation and maintenance tasks on a conveyor system while it is in operation can cause
crushing and electric shock.
4
Power down the entire conveyor module and ensure that it cannot be started accidentally.
Fasten screws with a tightening torque of 19 Nm.
Requirement:
R
The module is shut down.
4
Remove finger guard and PolyVee belt,
see "Replacing the finger guard and PolyVee belt",
.
4
Unscrew taper screws (1) in roller (2) on the right and left from the C-profile of the side
frames.
4
Pull the roller to the top out of the side frames at an angle. Remove drive belt from roller in
the process.