4.0
Prepare to Build Your Runtime Image
The first part of this publication got you up and running with a sample runtime image
that you used to explore some of the Target Device features. This part of the
document guides you through creating your own runtime image. Although you will not
be using your Target Device again for a while, the steps in the remainder of this
publication assume that you have completed the setup steps.
Task Checklist and Completion Times
Below are the key tasks you will complete in the remainder of the chapters. You must
complete each of these tasks in order. Upon completing one chapter, continue to the
next until you reach the optional information in the appendices.
The full installation process, including the steps to build your own runtime image takes
several hours. The time required will vary, depending on your skills and experience,
the processor speed of the system that you use to perform the configuration steps,
and the speed of your internet connection.
The estimated completion times in the table below are based on Ubuntu* Desktop
14.04 running on an Intel
®
Core
™
i5 second generation processor and with an internet
connection running at approximately 3 MB per second.
You will prepare the Host System before working more with the Target Device.
Note:
Host System refers to a computer system onto which the development tools from
Wind River Systems, Inc. will be installed. Target Device refers to the hardware that is
included in your Development Kit.
Done
Task
Section
Estimated Completion
Time
Preliminary Steps
30 - 90 minutes
✔
Gather necessary components
on page
14
10 minutes
✔
Connect the Target Device and a Host
System
on page 18
10 minutes
Update Host System Linux
on page 23
10 minutes to 1 hour,
depending on the
number of updates to
install
Create Host System directories, and
confirm Host System free space.
page 23
10 minutes
continued...
4.1
Intel IoT Gateway Development Kit DK200 Series —Prepare to Build Your Runtime Image
Intel
®
IoT Gateway Development Kit DK200 Series
Getting Started Guide
April 2015
22
Order No.: 330295-004