This document is property of NIIGATA POWER SYSTEMS CO., LTD. It must be neither reproduced nor communicated nor published without permission.
S E C T I O N
3
- M A I N T E N A N C E
3.5 MAINTENANCE AND INSPECTION SCHEDULE
3-5-10
No
Maintenance work
reference
D -13
D -14
D -15
D -16
D -17
Governor driving
- Gear inspection.
Inspection and cleaning of filters
Flexible coupling (if equipped)
- Inspection of inside of coupling at first 6000hours.
Fuel feed pump
- Replace oil seal and gaskets.
Cooling Water pump
- Replace mechanical seal and oil seal.
- Replace ball bearings.
- Check pinion.
Manual of
geislinger
coupling
●
Inspection E
Interval :15,000 hours
No
Maintenance work
reference
E -01
E -02
E -03
E -04
Cylinder head
- Replace all gaskets.
- Remachine intake/exhaust valve and valve seat.
Replace if necessary.
- Replace valve rotator.(if equipped)
- Replace cotter on intake and exhaust valve.
- Measure clearance rocker arm and rocker arm shaft.
Piston
- Replace piston rings.
- Check piston ring grooves.
Cylinder liner
- Check inside of cylinder liner. Re-horning by means of
special tool is recommended.
- Remove liner and check scaling on water jacket side ; on
any 2 cylinders at first maintenance E.
Gear train
- Measure back lash.
Summary of Contents for NIIGATA MG(L)26HLX
Page 2: ......
Page 34: ......
Page 38: ......
Page 40: ......
Page 60: ......
Page 66: ......
Page 68: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 94: ......
Page 107: ......
Page 108: ......
Page 110: ......
Page 130: ......
Page 132: ......
Page 170: ......
Page 174: ......
Page 186: ......
Page 188: ......
Page 192: ......