This document is property of NIIGATA POWER SYSTEMS CO., LTD. It must be neither reproduced nor communicated nor published without permission.
S E C T I O N
3
- M A I N T E N A N C E
3.5 MAINTENANCE AND INSPECTION SCHEDULE
3-5-08
●
Inspection C
Interval : 2,500 hours
No
Maintenance work
reference
C -01
C -02
C -03
C -04
C -05
C -06
C -07
C -08
C -09
C -10
C -11
C -12
Cylinder head (heavy fuel operation)
- Check intake and exhaust valve/valve seat and recondition.
- Clean deposit on combustion surface.
- Measure valve guide wear and check any hard mark.
Crank shaft deflection measurement
Cam shaft
- Cam and roller inspection through inspection doors.
Renewal governor oil
Flexible coupling (if equipped)
- Check tightening.
Engine fixing bolts
- Check tightening.
Fuel injection pump
- Verify smooth function of fuel control rack.
Over speed trip (if equipped)
- At idling in warm condition, verify the function of
over speed trip.(at no load or clutch-off)
Starting air distributor
- Visual inspection.
Air motor (if equipped)
- Check pinion.
Turbo charger
- Clean air filter elements.
Coolers (sea water cooling)
- Check zinc bar on
・
Fresh water cooler
・
Lub. oil cooler
・
Air cooler
Manual of
air motor
Manual of
T/C
Summary of Contents for NIIGATA MG(L)26HLX
Page 2: ......
Page 34: ......
Page 38: ......
Page 40: ......
Page 60: ......
Page 66: ......
Page 68: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 94: ......
Page 107: ......
Page 108: ......
Page 110: ......
Page 130: ......
Page 132: ......
Page 170: ......
Page 174: ......
Page 186: ......
Page 188: ......
Page 192: ......