This document is property of NIIGATA POWER SYSTEMS CO., LTD. It must be neither reproduced nor communicated nor published without permission.
S E C T I O N
3
- M A I N T E N A N C E
3.5 MAINTENANCE AND INSPECTION SCHEDULE
3-5-19
year
1 year
2 years
3 years
4 years
5 years
running hour
Maintenance work
×
1000
4
8
12
16
20
24
28
32
36
40
Replace crank-pin bolt of
connecting rod
○
Replace big-end bearing shell
○
○
Replace expansion joint of
exhaust manifold
○
○
Inspection torsional vibration damper
○
○
Overhaul lub. oil pump,
replace bushing and O-ring
○
Replace ball bearing of idle gear shaft
○
Replace intake and exhaust valve
spring
○
Replace
main
bearing
shell
○
Replace thrust collar of crank case
○
Overhaul and inspection safety
valve of cylinder head
○
○
Remove and inspection cylinder liner
○
Overhaul coolers
○
○
○
○
○
Replace casing of turbo charger
○
Replace fuel injector and
fuel inlet pipe(union)
○
Overhaul compressor
○
○
○
○
○
Inspection Air starting
valve , Distributor
○
○
○
○
○
Inspection
Cam
metal
○
Reconditioning Crank shaft cam wear
○
○
Replace
Piston
pin
metal
○
Inspection Valve gear roller
○
○
○
○
○
Replace Ball bearing and Ball joint
for fuel control linkage
○
Replace fuel cam roller and Bush
○
Inspection
fuel
feed
pump
○
Check the rod big end inner circle
○
○
Note) It follows the manual of TURBO CARGER for the handling of TURBO CHARGER.
Summary of Contents for NIIGATA MG(L)26HLX
Page 2: ......
Page 34: ......
Page 38: ......
Page 40: ......
Page 60: ......
Page 66: ......
Page 68: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 94: ......
Page 107: ......
Page 108: ......
Page 110: ......
Page 130: ......
Page 132: ......
Page 170: ......
Page 174: ......
Page 186: ......
Page 188: ......
Page 192: ......