4 - MOVEMENT AND INSTALLATION
VIP80E-II
EN
4 - Pag. 5 / 22
4.5
BAR FEEDER INSTALLATION (without displacement)
WARNING - CAUTION:
the installation and connections must be carried out according to the indications
provided by the manufacturer. The responsible person will also take into
account all regulative and law requirements, carrying out all the installations
and connections workmanlike. Once the installation has been completed, and
before the operating phases, he will check if the above-mentioned requirements
have been fulfilled.
The floor should be stable and levelled to guarantee good fastening to the ground.
Provide an area of suitable dimensions according to the type of bar feeder used.
The areas "D" (work area) and "E" (bar feeding area) should be properly delimited to prevent
collisions between the operator and any handling equipment or transport vehicles travelling
near the bar feeder.
The selected area should be illuminated and provided with an electric and pneumatic power
supply socket.
During operation, the bar feeder will release small amounts of oil mist. Install the bar feeder in
a suitably ventilated area.
The bar feeder has not been designed for use in an explosive atmosphere.
Summary of Contents for VIP80E-II
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 16: ...EN 1 INFORMATIONS GÉNÉRALES VIP80E II 1 Pag 6 6 ...
Page 44: ...EN 2 TECHNICAL INFORMATION VIP80E II 2 Pag 28 28 ...
Page 50: ...EN 3 SAFETY PROCEDURES GENERAL INFORMATION VIP80E II 3 Pag 6 6 ...
Page 80: ...EN 5 ADJUSTMENTS AND SETUP VIP80E II 5 Pag 8 8 ...
Page 100: ...EN 7 BAR FEEDER MAINTENANCE VIP80E II 7 Pag 6 6 ...
Page 104: ...EN 8 TROUBLES CAUSES CURES VIP80E II 8 Pag 4 4 ...