EN
4 - MOVEMENT AND INSTALLATION VIP80E-II
4 - Pag. 10 / 22
4.6.4 Bar feeder fastening
GROUND FASTENING
• Drill the floor and fix the lifting foot
with expansion plugs.
• Check the levelling and alignment once
more.
• Remove all the equipment used for the
levelling and alignment phases and
restore the initial bar feeder
conditions.
4.7
BAR FEEDER INSTALLATION (with displacement)
WARNING - CAUTION:
the installation and connections must be carried out according to the indications
provided by the manufacturer. The responsible person will also take into
account all regulative and law requirements, carrying out all the installations
and connections workmanlike. Once the installation has been completed, and
before the operating phases, he will check if the above-mentioned requirements
have been fulfilled.
The installation area must be in adequate environmental conditions (luminosity, ventilation,
etc.).
The floor must be steady and leveled in order to allow a correct fastening of the bar feeder.
If necessary locate the exact position by drawing the coordinates.
MAX 150
ł
14
8070_04_11_1
Summary of Contents for VIP80E-II
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 16: ...EN 1 INFORMATIONS GÉNÉRALES VIP80E II 1 Pag 6 6 ...
Page 44: ...EN 2 TECHNICAL INFORMATION VIP80E II 2 Pag 28 28 ...
Page 50: ...EN 3 SAFETY PROCEDURES GENERAL INFORMATION VIP80E II 3 Pag 6 6 ...
Page 80: ...EN 5 ADJUSTMENTS AND SETUP VIP80E II 5 Pag 8 8 ...
Page 100: ...EN 7 BAR FEEDER MAINTENANCE VIP80E II 7 Pag 6 6 ...
Page 104: ...EN 8 TROUBLES CAUSES CURES VIP80E II 8 Pag 4 4 ...