4 - HANDLING AND INSTALLATION
VIP80E
GB
4 - Pag. 9 / 21
4.6.4
Alignment and levelling
IMPORTANT:
not only alignment and
levelling are fundamental
for the correct running of
the bar feeder and for the
WARRANTY VALIDITY, but
also they must be carried
out only by a SKILLED
STAFF WITH PRECISE
TECHNICAL COMPETENCE.
For these operations proceed as
follows.
• Position the bar feeder near the
lathe (see figure).
• Open the upper guard and
manually transfer the bar pusher
(A) until you bring the ends
close to the spindle head (B).
• Remove two sections (C) from
the guide channel in order to use
the beam plane to check the
levelling.
• Verify the alignment of both bar
feeder axes and levelling.
Summary of Contents for VIP80 Evolution
Page 2: ......
Page 4: ......
Page 6: ......
Page 35: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 7 21 ...
Page 43: ...4 HANDLING AND INSTALLATION VIP80E GB 4 Pag 15 21 ...
Page 50: ......
Page 56: ......
Page 70: ......
Page 74: ...GB 7 BAR FEEDER MAINTENANCE VIP80E 7 Pag 4 5 Grease Grease ...
Page 76: ......
Page 84: ......