4 - HANDLING AND INSTALLATION
SIR-52-P/F
EN
4 - Pag. 21 / 22
4.9 LATHE
MODIFICATIONS
The lathe requires some adjustments obtained by
fitting special sleeves manufactured by IEMCA.
INFORMATION
Figure shows a general example; for
more details, apply to IEMCA service
department.
4.10
ALIGNMENT - FINAL CHECK
When the installation is over, make sure clamp
device (A) axis is aligned with the guide channel
axis.
Keep to the following procedure: move the clamp
device to the "bar insertion into collet" position
and close the sprockets by pressing key
.
Sprockets must close without interfering with the
bar pusher inserted into the clamp device.
In case of misalignment, please apply to IEMCA
technical assistance department.
Summary of Contents for SIR 52 P
Page 4: ......
Page 20: ...EN 2 TECHNICAL INFORMATION SIR 52 P F 2 Pag 12 16 2 6 TECHNICAL INFORMATION...
Page 50: ...EN 4 HANDLING AND INSTALLATION SIR 52 P F 4 Pag 22 22...
Page 126: ...EN 8 TROUBLES CAUSES CURES SIR 52 P F 8 Pag 6 6...
Page 130: ...EN 9 PART REPLACEMENT SIR 52 P F 9 Pag 4 4...
Page 136: ...EN 10 GUIDE CHANNELS BAR PUSHER REVOLVING TIPS SIR 52 P F 10 Pag 6 6...
Page 147: ...11 COLLETS SIR 52 P F EN 11 Pag 11 34...
Page 165: ...11 COLLETS SIR 52 P F EN 11 Pag 29 34...
Page 174: ...EN 12 LIST OF AFTER SALES CENTERS SIR 52 P F 12 Pag 4 4...