4. General description
Installation instructions TERRA AL 60 Max
22
To avoid overheating or a defect of the condensation run-o
ff
heating, following points must be
observed. The heating cable must not be laid in loops, and only as a single cable. The heating
cable must not touch itself (grinding - minimum distance 50 mm). Smallest bending radius 25 mm.
800
mm
min
.
200 mm
heating side connectio
condensation
run off
Well/pipe
300 mm
electrical connections
Canalisation
concrete base
concrete base
Placement and Installation
Special actions have to be set for the appearing condensate. As a result of a defrosting circle
up to 15 lt. condensate within 2 minutes can occur on every evaporator unit. It must be ensured,
that the condensate is discharged. The condensate outlet must be secured by the pre-mounted
heating cable. The heating cable extends approx. 1 m into the drain hose
4.14. Condensate run o
ff