![iDM TERRA AL 60 Max Technical Documentation Installation Instructions Download Page 17](http://html1.mh-extra.com/html/idm/terra-al-60-max/terra-al-60-max_technical-documentation-installation-instructions_3722227017.webp)
(C) IDM Energiesysteme GmbH
Installation instructions TERRA AL 60 Max
17
Placement and Installation
4.8. Placing the heat-pump on site
When the heat pump is loacated on its
fi
nal site, the crate can be removed. The standing feet are turned up-
wards, and the pallet is removed. Subsequently, the heat pump must be leveled.
The heat pump must be leveled by the 4 base feet (100 mm).