![IBM 9008-22L Site And Hardware Planning Download Page 98](http://html1.mh-extra.com/html/ibm/9008-22l/9008-22l_site-and-hardware-planning_3427298098.webp)
Table 84. Supported power cords for POWER9 systems
1
(continued)
Feature codes
(FC)
Description
Voltage, cord
set amperage,
and length
IBM shipped
plug
Matched female
wall receptacle
(on wall)
IBM part
number
EPAD
2
Type Rong Feng
RF-203P
192 - 400 V dc,
10 A, 2.5 m (8
ft)
HVDC plug
HVDC receptacle 00RR617
EB3H
DC power
cable
3, 4
-48 V dc, 25 A, 3
m (10 ft)
Multi-Beam XLX
3 position
connector
Two-hole,
standard barrel
lug
5
00RR437
Notes:
1. The part numbers that are mentioned in this table meet the European Union Directive 2002/95/EC on the
Restriction of the Use of Certain Hazardous Substances in Electrical and Electronic Equipment.
2. FC EPAC can be used to allow IBM Manufacturing to select a length of cord (1.0 m (3.3 ft), 1.5 m (4.9 ft), or
2.5 m (8 ft)) during rack integration.
3. FC EB3H includes a 750 watt power supply and circuit breaker for FC EPB8 (power distribution panel).
4. Wire size is 10 AWG (American Wire Gauge).
5. FC EB3H attaches to FC EPB8.
6. India only.
Table 85. Supported server to PDU power cords on POWER9 systems
Feature codes
(FC)
Description
Voltage,
amperage, and
length
Power cord (left
end)
Power cord
(right end)
IBM part
number
4558
END8
2
IEC 320
C19/C20
200 - 240 V ac,
16 A, 2 m (6.5 ft)
Plug Type 56 IEC
320 C20
Plug Type 61 IEC
320 C19
39M5389
01KV684
6458
6577
1
END2
2
END3
2, 3
Type 26 IEC320
C13/C14
200 - 240 V ac,
10 A, 4.3 m (14
ft)
Connector Type
26 IEC 320 C13
Plug Type 26 IEC
320 C14
39M5510
39M5510
01KV682
01KV679
84 Power Systems: Site and hardware planning
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...