Loading sequence
Follow these loading sequence steps:
1. Collect power requirements for all units that are connected to the 7188 or 9188 PDU. See your server
specifications for specific power requirements.
2. Sort list by total power that is required from highest power draw to lowest power draw.
3. Connect highest power drawer to outlet 1 on circuit breaker 1.
4. Connect next highest power drawer to outlet 3 on circuit breaker 2.
5. Connect next highest power drawer to outlet 5 on circuit breaker 3.
6. Connect next highest power drawer to outlet 7 on circuit breaker 4.
7. Connect next highest power drawer to outlet 9 on circuit breaker 5.
8. Connect next highest power drawer to outlet 11 on circuit breaker 6.
9. Connect next highest power drawer to outlet 12 on circuit breaker 6.
10. Connect next highest power drawer to outlet 10 on circuit breaker 5.
11. Connect next highest power drawer to outlet 8 on circuit breaker 4.
12. Connect next highest power drawer to outlet 6 on circuit breaker 3.
13. Connect next highest power drawer to outlet 4 on circuit breaker 2.
14. Connect next highest power drawer to outlet 2 on circuit breaker 1.
Following these rules allows the load to be distributed more evenly across the six PDU circuit breakers.
Ensure that your total power load is below the maximum that is listed in the table and that each circuit
breaker is not loaded above 16 A.
106 Power Systems: Site and hardware planning
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...