Table 45. Dimensions for rack (continued)
Width
Depth
Height
Weight (Empty)
Weight
(Maximum
configuration)
EIA unit
capacity
Note: When the rack is delivered or is moved, outriggers are needed for stability. For more information about
outriggers, see Side stabilizing outriggers.
Table 46. Dimensions for doors
Door model
Width
Height
Depth
Weight
Standard front
door (FC EC01)
and
standard back
door (FC EC02)
597 mm (23.5
in.)
1925 mm (75.8 in.)
22.5 mm (0.9 in.)
7.7 kg (17 lb)
Triplex door (FC
EU21)
3
597.1 mm (23.5
in.)
1923.6 mm (75.7 in.)
105.7 mm (4.2 in.)
1
16.8 kg (37 lb)
128.3 mm (5.2 in.)
2
1
Measured from the front flat surface of the door.
2
Measured from the IBM logo on the front of the door.
3
Multiple racks that are placed side-by-side must have a 6 mm (0.24 in.) minimum clearance between racks to
allow the triplex front door to hinge properly. Feature code EC04 (Rack suite attachment kit) can be used to
maintain the 6 mm (0.24 in.) minimum clearance between racks.
Table 47. Dimensions for side covers
1
Depth
Height
Weight
885 mm (34.9 in.)
1870 mm (73.6 in.)
17.7 kg (39 lb)
1
Side covers do not increase the overall width of the rack.
Table 48. Temperature requirements
Operating
Nonoperating
10°C - 38°C (50°F - 100.4°F)
1
-40°C to 60°C (-40°F to 140°F)
1
The maximum 38°C (100.4°F) temperature must be derated 1°C (1.8 °F) per 137 m (450 ft) above 1295 m
(4250 ft).
Table 49. Environmental requirements
Environment
Operating
Nonoperating
Maximum altitude
Noncondensing humidity
20% - 80% (allowable)
40% - 55%
(recommended)
8% - 80% (including
condensing)
2134 m (7000 ft) above
sea level
Wet bulb temperature
21°C (69.8°F)
27°C (80.6°F)
Site and hardware planning 39
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...