![IBM 9008-22L Site And Hardware Planning Download Page 46](http://html1.mh-extra.com/html/ibm/9008-22l/9008-22l_site-and-hardware-planning_3427298046.webp)
Figure 3. Caster and leveler locations
Note: Rack units are large and heavy and are not easily moved. As maintenance activities require access
at both the front and the back, extra room is needed. The footprint illustration does not show the radius of
the swinging doors on the I/O rack. A service clearance of 915 mm (36 in.) needs to be maintained on
front, rear, and sides of the I/O rack.
Related reference
7014-T00 and 7014-T42 rack weight distribution and floor loading
Racks can be heavy when populated with several drawers. Use the Weight distribution distances for racks
when loaded and Floor loading for racks when loaded tables to ensure proper floor loading and weight
distribution.
Related information
Planning for the installation of rear door heat exchangers
32 Power Systems: Site and hardware planning
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...