• Humidity requirements of the devices.
• Air flow requirements of the devices.
• Air quality of the location where the devices are used. For example, excess dust can damage your
system.
Note: The system and devices are designed to operate in normal office environments. Dirty or other
poor environments might damage the system or the devices. You are responsible for providing the
proper operating environment.
• Altitude limitations of the devices.
• Noise emission levels of the devices.
• Any vibration of equipment near where the devices are placed.
• Paths of power cords.
The following pages contain the information that you need to evaluate these considerations.
Site preparation and physical planning guidelines
These guidelines help you prepare your site for the delivery and installation of your server.
The Site preparation and physical planning topic covers the following information:
Site selection, building and space considerations
• Site selection
• Access
• Static electricity and floor resistance
• Space requirements
• Floor construction and floor loading
• Raised floors
• Conductive contamination
• Computer room layout
Site environment, safety, and security
• Vibration and shock
• Lighting
• Acoustics
• Electromagnetic compatibility
• Computer room location
• Material and data storage protection
• Emergency planning for continuous operations
Electrical power and grounding
• General power information
• Power quality
• Voltage and frequency limits
• Power load
• Power source
• Dual power installations
Air conditioning
• Air conditioning determination
4 Power Systems: Site and hardware planning
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...