![IBM 9008-22L Site And Hardware Planning Download Page 69](http://html1.mh-extra.com/html/ibm/9008-22l/9008-22l_site-and-hardware-planning_3427298069.webp)
Figure 16. Caster and leveler locations
Cabling the 7965-S42 rack
Learn about the different cable routing options available for the 7965-S42 rack.
Cabling within the rack
Side cable channels are available in the rack to route cables. Three cable channels are on each side of the
rack.
Site and hardware planning 55
Summary of Contents for 9008-22L
Page 1: ...Power Systems Site and hardware planning IBM...
Page 4: ...iv...
Page 14: ...xiv Power Systems Site and hardware planning...
Page 16: ...2 Power Systems Site and hardware planning...
Page 20: ...6 Power Systems Site and hardware planning...
Page 40: ...Figure 1 FC EPB8 power distribution panel 26 Power Systems Site and hardware planning...
Page 49: ...Figure 5 FC ERG0 rear rack extender top down view Site and hardware planning 35...
Page 123: ...Figure 35 Cable management bridge lances Site and hardware planning 109...
Page 163: ......
Page 164: ...IBM...